Demand is exploded through multi-level bills of materials into planned purchase and production, then executed, inspected and costed on the shop floor.
- Production Planning
MRP nets requirements against on-hand stock, open purchase orders and open production.
- Material Requirements
Multi-level BOM explosion using low-level codes produces planned orders.
- Scheduling
Work orders are scheduled against work-centre calendars and downtime.
- Material Issue
Raw materials are issued from warehouse to production, or to subcontractors.
- Production & WIP
Execution records quantities, machine time and consumption; WIP is tracked and reconciled.
- Quality Inspection
Output is inspected before it becomes saleable stock.
- Finished Goods
Finished goods are received into stock with batch or serial traceability.
- Costing
Material and production cost roll into finished-goods value.
Financial variance analysis is on the roadmap.
- Material shortages visible before they stop a line
- Forward and backward batch traceability
- WIP that agrees with the ledger